MTB Cycling, 06Feb2015
My second solo ride from my home in Kampar to Halaman Tualang Indah, on the fringe of Tanjung Tualang town.
Left Kampar at about 9 am, the 12.41 km journey took me about 40 min, clocking an average speed of just above 20 km/h with a max of 34.1 km/h, using top two gears most of the way.
Compared to my first solo trip exactly two months ago on 6Dec14 with its avg speed of 17 km/h and max of 24 km/h, this is an improvement, thanks to all the training I got from riding with Kampar Cycling Community and Kampar Golden Riders.
Walking the C2C Trail: from CP6 to CP7
Our second leg of walking the Coast-to-Coast Trail, from CP6 to CP7, took place on Sun 2019.09.22, a day after we completed our first l...
-
Started from AMK Ave 1 Blk331 through Bishan-AMK Park, I covered the following park connectors on this 28 km ride: Central Urban Loop (1)...
-
Tue 20191029 Coast-to-Coast Trail Day 05 Start CP 07 Sengkang Hockey Stadium 0935 hrs End CP 1...
-
It's Wednesday, 31st January 2018, and we're embarking on a long ride on this last day of January. Our aim was to cycle on a loop ...