Wednesday, 31 January 2018

Long ride to Tapah-Chenderiang-Sahom

It's Wednesday, 31st January 2018, and we're embarking on a long ride on this last day of January.

Our aim was to cycle on a loop from Kampar through Air Kuning, Banir, Tapah, followed by two small hill climbs through Chenderiang, down to the foothills at Sahom and Sungei Siput South before proceeding northwards to Gopeng then southwards back to Kampar via Kopisan Lawan Kuda and Kota Bahru.

0704hr Ganesans house 4.12km
There were four of us in this ride: me, Ganesan the event host, Adrian Wong and Thaneswaran. We set off from Ganesan's house in Jalan Degong Kampar shortly after seven o'clock and headed west towards Mambang Diawan.

0708hr Leaving Ganesans house 02 4.12km

0726hr Towards Mambang Diawan

The ride to Mambang Diawan was easy and quiet with some swift but occasional traffic passing us along the way.

0727hr Towards Mambang Diawan 02

Just before Mambang Diawan village, I came across a Shell service station and decided to stop to inflate by bicycle tyres. I had been busy recently and didn't find time to bring the bicycle out to the petrol station in Kampar new town to pump it up to standard pressure of 50 psi.


0730hr Inflated tyres at Mambang Diawan Shell
We continued our journey, passed through the main road of Mambang Diawan, and by about a quarter to eight we were approaching Air Kuning town.

0742hr Towards Air Kuning

It was about eight o'clock when we arrived at our usual breakfast stop: a road-side shop in Air Kuning, where I had my second cup of black coffee and a small bean paste dumpling.

0809hr Breakfast at Air Kuning 02 15.83km

0813hr Breakfast in Air Kuning 15.83km


At 8:18 am, we resumed our ride towards Banir Village, on our way to Tapah. It was a straight and quiet road most of the way, with gentle gradients. The cool morning weather with cloudy skies made it a pleasant ride.

0823hr Road to Banir

0829hr Road to Banir 02


0851hr Banir almost there

Banir came and went with stopping at about nine o'clock. It was about 26km into our ride and we cruised onwards to Tapah.

0902hr Just passing Banir 26.01km


0904hr Junction Banir to Tapah After 26km


0910hr Reached Banir - Tapah junction 26.01km

There's a new park on the main approach to Tapah town that I haven't visited before. It's called Dataran Amanjaya Temoh, named after Temoh, a small town nearby. Adrian and I decided to detour into the park and look around. There were a few families and young people around, some walking, some jogging and some just sitting down looking at their children run around in the park.

0909hr Drop by Dataran Amanjaya Temoh

After exploring Dataran Amanjaya Temoh briefly, we resumed our journey southwards, arriving on the northern fringe of Tapah town at about 9:45 am. We have cycled a distance of 34.61km.

0934hr Road to Tapah 02

0945hr Reached Tapah 34.61km

It was Thaipusam day this 31st January, and the Hindu temple near the junction of the road leading uphill was crowded with people. There were many stalls selling souvenirs and religious items and there was loud religious music too. It was indeed a joyous occasion.

We started our first hill-climb of the morning at about 9:51 am, heading for Chenderiang town on the other side.

0951hr Climbing the hill behind the Hindu temple in Tapah


0952hr Climbing the hill behind Tapah

We reached the peak and began our downhill roll at about a quarter past ten. It was 40.06km into our journey and we were eagerly looking forward to our ice-kacang break in Chenderiang town ahead.


1022hr The happy downhill roll towards Chenderiang town

We arrived in Chenderiang about half an hour later at 1035hr


1034hr Yay! The ice-water stall is just a stone throw ahead.

1034hr This has become our customary way of announcing our arrival in Chenderiang


Tucking in to our refreshments eagerly
At the ice and fruit stall, just dismounted and looking rather dazed from the gravity of the earth.


This shot was taken before the fruits and drinks arrived


We finished our refreshments resumed our ride at a quarter past eleven, moving onwards to our second hill-climb of the morning.


1114hr Chenderiang hill and beyond, here we come

After having climbed this small hill for about half a dozen times, I didn't expect it to be difficult. I underestimated my level of fitness this time, for I soon became somewhat fatigued and had to take a break under a bridge, with the North-South Highway and its roaring vehicles above me.

It was just about five km from the Lata Kinjang waterfalls junction, and a couple of km more to the peak. We had covered 51.47km so far.


1154hr Rest stop under the NS Highway, 51.47km


1237hr The climb continues
At about one o'clock, we reached Sahom village at the foothills. It was 61.90 km of our ride.

1256hr At Sahom. Taking a break under the shade of some trees.

A momento from our stop at Sahom
We carried on our ride towards Kuala Dipang, with its junction leading to the main trunk road. It was very hot and I was getting both thirsty and tired.

1314hr Approaching the Kuala Dipang junction with the trunk road from Kampar

"Getting very hot now, tired?" my wife asked in a message on my phone.

It was 1327hr and I had almost made up my mind to return to Kampar instead of carrying on the journey with the rest to Gopeng and beyond.

"Yea hot", I replied from the road side, "Reached K. Dipang junction. Coming back on my own by main road to Bandar Baru. Not joining them to Gopeng and beyond."

That was at the 67.87km point. I broke away from Ganesan, Adrian and Thanes to head southwards back to Kampar town while they continued north to meet up with Fabian and Lee Lean Wylie in Gopeng in their quest to complete their 100 km target.


It was 75km, taking into account my 4 km unrecorded ride to Ganesan's house.

Arriving home at about 2.40 pm, it was a 75km ride for this final day of January 2018. My legs were quite well tanned and I nicknamed today's ride, "The Sun Tan Ride".



Wednesday, 4 October 2017

A morning ride to Taman Alam Kinta

Of late it has been our habit to take short - medium distance rides to some places nearby on Wednesday mornings. This morning our group of five comprising Ganesan (event host), Eugene Lim, Adrian Wong, Leroy Tan went on a 44 km ride to Taman Alam Kinta via Kota Bahru, returning by the Kinta River banks, before making our usual refreshment stop at Kenneth Sai's coffee shop, Yen Lee Thong, in Malim Nawar.

0842 hr 7.73km After the Malim Nawar intersection, waiting for Adrian.
Adrian Wong was delayed at home after fetching his children to school. He told us to set off on our journey ahead of him and he'll catch up with us soon. Three of us left Westlake Villas at the foot of the bridge over the railway tracks at about 0815hr. Not long after, Leroy caught up with us and we rode westwards along the new road that connects to Kota Bahru town. Soon after crossing the traffic lights intersection near Malim Nawar, we stopped by the road side under the cool morning sun for a few minutes to allow Adrian to catch up with us


About an hour later, we passed Kota Bahru station, and were on the off road tracks approaching Taman Alam Kinta (the Kinta Nature Park), on the east side of the Kinta River.

0940hr 19.37km Approaching Taman Alam Kinta


0944hr 19.88km At the park entrance
We reached Taman Alam Kinta at about a quarter to ten in the morning and spent about half an hour there. It was a cool, shade place facing a quiet serene lake (a disused mining pool) with birds flying about while the park workers were cleaning up some dried leaves.

Location: 4° 25' 21.036" N, 101° 3' 39.4164" E
Google map link: http://bit.ly/2ynZbdQ




Some photos from the park:

With Adrian to my right. We're not twins. We're bTwins.


The still, quiet lake in the background.

 The section of the park we were in faces a large still lake surrounded by shade from many trees. It reminds me of MacRitchie Reservoir in Singapore which my wife and I visited recently for a morning hike, though not as large and well equipped.

A five-storey observation tower


There was a lonely looking observation tower about a hundred yards from the lake side. Eugene Lim decided to climb all the way to the top deck without telling us. Eventually we all followed suit and soon we were taking photos and enjoying the view and the cool fresh air from the fifth storey of the tower.

Here are a couple of photos taken from the top of the observation tower.

View from the fifth storey of the observation tower

Another tower view looking across the lake.

We left Taman Alam Kinta shortly after ten and cycled eastwards in the direction of the Kinta River, reaching the eastern river bank by about 10:15 am. I could hardly see the river because both sides of the river banks are overgrown with weeds and other undergrowth.

The Kinta River is all but hidden from view by lush undergrowth


1037hr 25.22km Taking a break by the bridge at Kota Bahru
Then we took a loop southwards and eastwards all the way back to Kota Bahru station from where we started our offroad trek earlier. We took a short break while waiting for Ganesan and Eugene to buy some food from the only coffee-shop in the vicinity.


1104hr 31.26km Taking a break under some shade at Kg Tg Bunga.
After that, we resumed cycling the final ten kilometres to the Malim Nawar junction. Our final destination was our usual coffee break at Kenneth Sai's shop in Malim Nawar. Leroy, a fast rider, went ahead of us, while Eugene Lim and me rode slower and got left behind him. Meanwhile Adrian and Ganesan, who were some distance behind us, took a short cut and reached Sai's Shop ahead of us.
We decided to stop for a break under some shade at Kg Tg Bunga, about 4 km from Sai's Shop. 

When we arrived at Sai Shop at shortly after eleven, Leroy, Ganesan and Adrian were already having their coffee and breakfast.

1119hr 35.39km At Yen Lee Thong coffee shop, Malim Nawar

After a little chit-chat, we left Malim Nawar for Kampar at about 10.40 am. I reached home about half an hour later, covering a total distance of 44.14km with 2 hr 51 min of total cycling time.

A brief description of Taman Alam Kinta is available from the Batu Gajah District Council page.

Sunday, 17 September 2017

A reach too far

Today's ride is a dry-run of next Sunday's 85km event to enter the Malaysia Book of Records as "the first and largest group tandem ride for visually impaired people", named Tour de VIP, organised by the Blind Empowerment Society of Selangor (BESS).

Taking part in this trial run are Ganesan, Sean working with St Nicholas' Home Penang, Naveen the marketing and communications manager of Grand Kampar Hotel and me.

We assembled at the Lobby of Grand Kampar Hotel and set off shortly before 0800hr



By 0802hr we have covered 7.08km as we crossed the bridge approaching the Malim Nawar - Tanjung Tualang intersection.



It took us another 17 minutes to arrive at the bridge over the Kinta River before Tanjung Tualang, at the 11.31km mark of our journey. At 0819hr, we crossed the bridge.



Sean and I were ahead of Ganesan and Naveen. We reached Chenderong at 0854hr. Sean, a friendly Irishman from Belfast, waited with me for the other two at the roadside opposite the entrance to Chenderong Village. The sun was shining in our faces.

When Ganesan and Naveen arrived, we decided to stop for breakfast at one of the coffee shops, although Sean was somewhat concerned that it's getting late and we're not covering enough ground.

This was the 21.32km point in our ride.



We tried not to take too long to finish our breakfast and, pushing on with our pedalling, we reached Batu Gajah at 0955hr, covering 28.21km of our ride.

Turning right at the traffic intersection, we crossed the tall bridge over the railway tracks below and rode on until we arrived opposite Kellie's Castle.



After passing Kellie's Castle (34.31km) at 1035hr, we reached the Shell service station on the approach to Gopeng town (42.13km) at 1110hr.

There was a Chinese confectionery shop adjacent to the service station. Sean bought us bottles of cold refreshing water from the shop. We met a convoy of superbikers who stopped by to take a break too.



Pressing on through Gopeng town, we entered the Kopisan - Lawan Kuda junction, 46.94km, at 1156hr.

Despite the hot sun overhead, we went on to cover another 14 km, reaching Kota Bahru station (60.42km) at 1310hr. The heat was enervating and I was really "feeling the heat", literally.


Eventually we reached Malim Nawar 70.22km at 1420hr after a slow laboured ride. I was suffering from the oppressive afternoon sun with sparse cloud cover. My water supply was running low.

In the end, I had to abandon the ride after getting some cold drinks at Kenneth Sai and Chooi Yin Chong ''s coffee shop. My wife drove over to fetch me home, leaving the other riders to proceed with the last 15 km to Grand Kampar Hotel.

It was a reach too far for me today.

Walking the C2C Trail: from CP6 to CP7

Our second leg of walking the Coast-to-Coast Trail, from CP6 to CP7, took place on Sun 2019.09.22, a day after we completed our first l...